Description

Disclaimer!


It would seem that ae2 cables and p2p interfaces do not play well with schematics from create (or templates from building gadgets)!


This schematic does NOT place any p2p interfaces, or cables! Just the connectors and controllers!


 


A build of the (in)famous Sath Controller for AE2. Intended for atm-packs, it needs Applied Energistics 2 (obviously) as well as ExtendedAE2 for the wireless connectors.


The build uses red, black, light blue, and white cables and connectors. There are 23 wireless connectors within it: 2 on the 6 outer sides (12 total), 1 within each smaller cube (8 total), and 3 in the very middle.


These need to be connected to an outside controller, from which you can then route the p2p channels. You can then setup p2p interfaces from there, and the first cable leading OUT of such a p2p interface, should lead into an energy acceptor to power it all.


 


For more information about it, visit the all the guides page for it. This schematic is only the main controller, as the subnet is actually wayyy more flexible in its shape and possibilities.

Mod Version
6.0.0
Game Version
1.21.X
Category
Uploaded
4 days ago
Author
Views
498
Rating
No rating

Comments

You must be logged in to leave a comment.